EasyManua.ls Logo

Enterasys S8-Chassis-POE4 - Chapter 3: Chassis Setup; Required Tools

Enterasys S8-Chassis-POE4
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Enterasys S-Series S8 Chassis Hardware Installation Guide 3-1
3
Chassis Setup
ThischaptercontainsinstructionsonsettinguptheS8chassis.
Required Tools
•ESDwriststrap(includedwiththeS8chassis)
Phillipsscrewdriver
•Flatbladescrewdriver
APhillipsscrewdriverisneededtoinstalltheunitina48.26centimeter(19inch)equipmentrack.
Aflatbladescrewdriverisneededtosecurethepowersuppliesandtoremoveandreinstallthe
Electrical Hazard: Only qualified personnel should perform installation procedures.
Riesgo Electrico: Solamente personal calificado debe realizar procedimientos de instalacion.
Elektrischer Gefahrenhinweis: Installationen sollten nur durch ausgebildetes und qualifiziertes
Personal vorgenommen werden.
For information about... Refer to page...
Required Tools 3-1
Unpacking the S8 Chassis 3-2
Installing the S8 Chassis 3-3
Attaching the Electrostatic Discharge Wrist Strap 3-14
Installing and Removing an S-AC-PS Power Supply 3-14
Powering up the S8 Chassis 3-19
Removing and Installing a Fan Tray 3-19
Installing and Removing an S-POE-PS Power Supply 3-21
Connecting Power to the S-POE-PS Power Supplies 3-24
LEDs 3-25
Connecting to the COM Port for Local Management 3-28
Completing the Installation 3-31
Important Notice
Read the Release Notes specific to the firmware image running in the chassis to check for any
exceptions to the supported features and operation documented in this guide.

Table of Contents

Related product manuals