EDA 2530 Commissioning Procedure for Cable and Wireless Access
1/153 22-FGC 101 0239/2 Uen Rev J 2010-04-01
© Ericsson AB 2010
Commercial in confidence
141 (200)
In the “Command” column, in the 1
st
entry double click the empty field and
select the “create” option from the drop-down list. Repeat for the next entry
in the column (if applicable), there will be a maximum of 10 entries one for
each installed POTS card.
y. Select “Apply All”, and the “Result” column should display “OK” against
each entry. If not OK then recheck that all entries are correct.
z. Select “Read Network” to save entries.
aa. The “Admin Status” column will display “out of Service” for each entry at
this point. The “Oper Status” column will display “not Configured” for each
entry at this point.