EDA 2530 Commissioning Procedure for Cable and Wireless Access
1/153 22-FGC 101 0239/2 Uen Rev J 2010-04-01
© Ericsson AB 2010
Commercial in confidence
145 (200)
f. Select “Read Network”.
g. Check the “Admin Status” column shows ‘inService’ for each POTS card.
h. Check the Oper Status column shows ‘restarting’ for each POTS card.
Note: The “Oper Status” column displays ‘restarting’ until the EDA2530 is
integrated into the network and the Soft-switch. It should then change to
‘inService’.
i. Exit the windows to return to the main LCT screen.
End of section