Bench Top User’s Manual
Operation
6.1.2 Door Operation
The chamber door is designed with a 2 step latching process:
1. In this position the door is not fully sealed and will cause the chamber to leak water, and
frost to accumulate in the workspace and on the gasket.
2. Apply pressure to the door handle to completely seal the gasket. In this position the door is
completely sealed.
FIGURE 6.2.DOOR LATCH STEPS 1 AND 2.