Test Results
NetBlazer 421
Summary (Link OAM)
Summary (Link OAM)
From the Test menu, tap Results, and the Summary tab.
Test Status displays the current status of the Link OAM test. The global
test pass/fail verdict is displayed next to the Test Status when enabled
(see Pass/Fail Verdict on page 275).
Start Time Indicates the date and time the test has been started. The
date and time is reset every time the test is restarted or reset.
Power Recovery when displayed, indicates that the test has
automatically recovered from a power failure. The number of
occurrences is also displayed next to the Power Recovery field. Refer
to Power Failure Recovery on page 559.
Logger Full, when displayed, indicates that the logger is full. Refer to
Logger and Alarms/Errors Logger on page 362.
Alarms
Link OAM indicates that no OAM Information PDUs were received for 5
seconds.
Critical Event: Indicates that the OAM link partner has sent a critical
event notification (bit 2 of the Flags field is set to 1).
Test Status Description
-- The test is not running or results are not available.
In Progress The test is running.
Completed The test is completed, stopped at the planned time, or manually stopped when there is no
set timer.
Aborted The test is interrupted; stopped before the set timer.