TOR
cod. 3542B750 - Rev 05 - 07/2022
12
EN
2. INSTALLATION
2.1 OPERATING CONDITIONS AND INSTALLATION POSITION
Connecting the electric heating device to the utility grid needs to be approved by the local power supply company.
If new central heating is built or old central heating is rebuilt, we suggest the meticulous design by professionals. Profes-
sional installation by an authorized service company is a condition of the manufacturer’s warranty! Therefore, seek help
from our contract partner for boiler connection that shall connect the boiler and provide the electric heating operation
prompt.
ANY CONNECTION TO THE UTILITY POWER AND ANY ELECTRICAL INSTALLATION MUST BE INSTALLED BY
QUALIFIED PERSONNEL, IN COMPLIANCE WITH ALL THE INSTRUCTIONS GIVEN IN THIS TECHNICAL MANUAL,
THE CURRENT PROVISIONS OF LAW, THE NATIONAL AND LOCAL REGULATIONS, AND THE RULES OF PROPER
WORKMANSHIP.
TOR electric boiler is predetermined to be permanently connected to public power distribution network. There shall be
a built-in instrument in the electric boiler for disconnecting a main switch fixed wiring. All pole break contacts shall be at
least 3mm apart with guidelines for starting observed.
The location for installation of TOR electric boiler shall allow any necessary approach when maintenance or repair. The
minimum distance between boiler and fixed barrier is shown in “fig. 5”.
At the time of assembly, it’s necessary to require the professional workers from the installation company to carry out sy
-
stematic demonstration and teach the system operating. The electric boiler warranty certificate must be confirmed to be
effective after commissioning by professional workers.
No electrical qualication is required for design and operation
of electrical equipment of the boiler. The operator can only
operate the control device and observe the manual or instruc
-
tions from the service company. Don’t tamper with electrical
installations when maintenance.
From the perspective of electric boiler installation, the pressure
water shall be disposed in the area where it is for adding water
and drainage. In addition, the disposal place must be with a
sufciently smooth wall area (the electric boiler is hung on the
wall)
Minimum distance Recommended distance
A 3 cm 15 cm
B 10 cm 30 cm
C 10 cm 20 cm
D
15 cm (starting from the initial
openable lid)
>25 cm
g. 5