EasyManua.ls Logo

Fike 10-071 User Manual

Fike 10-071
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installation Manual
P/N 06-369, Rev. 6
September 2015
10-071, Cheetah Xi 50
Addressable Fire Suppression Control System

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Fike 10-071 and is the answer not in the manual?

Fike 10-071 Specifications

General IconGeneral
BrandFike
Model10-071
CategoryControl Systems
LanguageEnglish

Summary

Introduction and Overview

Safety Information

Highlights important safety warnings and cautions used throughout the manual.

System Description and Features

System Description

Describes the Cheetah Xi 50 as a state-of-the-art addressable fire suppression control system.

Cheetah Xi 50 Features

Details the general, power, and signaling line circuit features of the Cheetah Xi 50.

Cheetah Xi 50 System Components

Cheetah Xi 50 Controller

Describes the controller as the central hub for system communication and control.

Intelligent Detectors

Details intelligent, addressable detectors with processing and control logic capabilities.

Addressable Modules

Details intelligent input/output modules for interfacing with conventional devices.

Batteries and Battery Enclosures

Details battery requirements for emergency back-up power and enclosure options.

Cheetah Xi 50 Installation Guide

Verify Field Wiring

Describes essential tests to perform on field wiring before connecting devices.

Connect AC Power to the Transformer

Details how to connect AC power to the transformer, including safety precautions.

Install the Cheetah Xi 50 Controller

Outlines the procedure for mounting the Cheetah Xi 50 controller board.

Connect AC Power to the Controller

Describes connecting AC power wiring from the transformer to the controller.

Install Batteries

Details how to install batteries and connect them for emergency back-up power.

Apply Power to the Panel

Guides on applying AC power and verifying initial panel operation.

Initial Power-Up with Field Wiring Connected

Guides on performing initial power-up after field wiring is connected.

Configure System

Outlines methods for configuring the Cheetah Xi 50 fire alarm system.

Acceptance Test

Details system testing procedures to ensure proper operation and compliance.

Battery Calculation and Power Requirements

Section 1 System Requirements

Provides a form to calculate system standby and alarm current requirements.

Cheetah Xi 50 Operating Instructions

Maintenance and Testing

Outlines requirements for system inspection, testing, and maintenance.

Related product manuals