6
15
Part
No.
Part Description
Labor
time
(min.)
Part Cost
(€)
Total
labor
time
(min.)
Total
time cost
(€)
Other
costs (€)
Total
Parts
Cost (€)
Total
Cost
(€)
----- 0 0.00 65 37.9 0.0 150.92
188.8
----- 0 0.00 15 8.8 0.0 19.35
28.1
----- 0 0.00 10 5.8 0.0 74.34
80.2
56
Mowing Unit +
cable
10 40.95 85 49.6 0.0 232.82
282.4
----- 0 0.00 10 5.8 0.0 47.20
53.0
----- 0 0.00 100 58.3 0.0 89.71
148.0
----- 0 0.00 0 0.0 17.5 0.00
17.5
----- 0 0.00 15 8.8 0.0 48.13
56.9
----- 0 0.00 0 0.0 0.0 0.00
0.0
----- 0 0.00 0 0.0 0.0 0.00
0.0
----- 0 0.00 0 0.0 0.0 0.00
0.0
----- 0 0.00 0 0.0 0.0 0.00
0.0
----- 0 0.00 0 0.0 0.0 0.00
0.0
----- 0 0.00 0 0.0 0.0 0.00
0.0
----- 0 0.00 0 0.0 0.0 0.00
0.0
----- 0 0.00 0 0.0 0.0 0.00
0.0
----- 0 0.00 0 0.0 0.0 0.00
0.0
----- 0 0.00 0 0.0 0.0 0.00
0.0
----- 0 0.00 0 0.0 0.0 0.00
0.0
5.00 175 18 662.47 855.0Total Time (Hours):
Part No. 3 Summary