EasyManua.ls Logo

FULTON FHE-250 - SECTION 2 - INSTALLATION; 2.1 GENERAL; 2.2 SITING

FULTON FHE-250
78 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FHE-250 MANUAL 09 2014 ISSUE 2
Page 5
2
The installation of the FHE-250 Hot Water Boiler should be carried out by competent personnel in
accordance with all relevant safety regulations. It is the responsibility of the installer to ensure that
these regulations are complied with.
WARNING
Maintenance on the burner assembly requires that the area directly in front of the boiler must
not be obstructed with pipework or equipment which would interfere with the removal of
the complete burner unit. Care should be taken on installation of the boiler to ensure this area
remains clear of obstructions.
!
WARNING
Do not allow weight to bear on equipment components to prevent damage.
!
SECTION 2 - INSTALLATION
2.1
GENERAL
2.2
SITING
(Reference should be made to Utilisation Procedures as stated in IGE/UP/10 Part 1
Communication 1676, and in particular to Section 5, Location of Appliances).
The boiler house should be sufciently large to allow easy and safe access to all parts of the boiler
for operational and maintenance purposes.
1. The boiler must stand on a oor which must be at, non-combustible, level and of a suitable
load bearing capacity to support the weight of the boiler (when lled with water) and any
ancillary equipment.
2. The boiler must not be tted outside.
3. Install so that all system components are protected from water (dripping, spraying, rain etc)
during boiler operation and service.
4. Minimum clearance for access should be maintained at 600 mm at the front and at least one
side of the boiler/modular installation.
5. Ensure all labels on the boiler will be fully visible for maintenance and inspection.

Table of Contents

Related product manuals