The FHE-250 may require 2 or more operatives to move it to its installation site, and when moving
into its installation location. Manoeuvring the boiler will include the use of a pallet truck or forklift and
may involve pushing and pulling.
Caution should be exercised during these operations.
Operatives should be physically capable, and knowledgeable in handling techniques, when
performing these tasks. The following precautions should be reinforced:
y Be physically capable.
y Use personal protective equipment as appropriate, e.g. gloves, safety footwear.
During all manoeuvres, every attempt should be made to ensure the following:
y Keep back straight.
y Avoid twisting at the waist.
y Avoid upper body/top heavy bending.
y Always grip with the palm of the hand.
y Use designated hand holds.
y Keep load as close to the body as possible.
y Always use assistance if required.
1.4.1
SAFE HANDLING
1.4.2
SAFE HANDLING OF SUBSTANCES
No asbestos, mercury or CFCs are included in any part of the boiler or its manufacture.