EasyManua.ls Logo

GE AKTA ready XL - Page 104

GE AKTA ready XL
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Position the isocratic inlet
m
anifold
Step Action
1 Locate and open the bag with the isocratic inlet manifold.
2 Hang the isocratic inlet manifold so it is supported by the inlet A valves
(X
V-001 to XV-006) (A). Then connect the isocratic inlet manifold to the
isocratic pump chamber inlet labeled IN using a TC clamp (B).
A
B
3 If your planned process requires a single pump, go to P
osition the air trap
tubing, on page 107.
If your planned process requires a second pump go to Position gradient in-
let manifold, on page 104.
Position gradient inlet manifold
T
hese instructions are only relevant for the gradient setup.
5 Preparation
5
.2 Install disposable flow kits
104
ÄKTA ready XL Operating Instructions 29281616 AE
*** TeDIS Valid on Date Printed Printed on: 15-09-2023 11:27:35 ***

Table of Contents

Related product manuals