9-8 170 Series Monitor Revision C
2000947-004
Maintenance: Preventative Maintenance Inspection
Unit to Primary Leakage
1. Configure a leakage tester to perform a unit AC line leakage test.
2. Turn ON the monitor using the monitor’s
On/Standby button.
3. Verify the following:
<300 µA
(132–253 VAC, or at the line voltage at your facility +10%)
4. Record the primary leakage for the following conditions:
Table 9-1. Unit to Primary Leakage Conditions
Neutral Ground Power (Polarity)
__________ Closed __________ Closed __________ Normal
__________ Closed __________ Open __________ Normal
__________ Closed __________ Open __________ Reversed
__________ Closed __________ Closed __________ Reversed
__________ Open __________ Closed __________ Normal
__________ Open __________ Closed __________ Reversed

Table of Contents

Other manuals for GE Corometrics 170 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Corometrics 170 Series and is the answer not in the manual?

GE Corometrics 170 Series Specifications

General IconGeneral
BrandGE
ModelCorometrics 170 Series
CategoryMedical Equipment
LanguageEnglish

Related product manuals