EasyManua.ls Logo

GE Healthcare Optima XR200amx - Page 83

GE Healthcare Optima XR200amx
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE HEALTHCARE OPTIMA XR200AMX/XR220AMX
D
IRECTION 5336113-1EN, REVISION 10 INSTALLATION MANUAL
Chapter 4 Configuration Page 83
Figure 4-12 HV cable clamp
f. Plug the other end of the DAP cable into the J6 bulkhead connector. See Figure 4-13.
Install cable ties as necessary to secure cable within the bulkhead area.
Figure 4-13 DAP meter cable attached to J6 on bulkhead
7. Confirm that there is sufficient slack in the DAP cable at the tube/collimator assembly:
a. Move the tube/collimator assembly through the full range of motion and verify that the
DAP cable remains connected to the DAP meter.
b. Once sufficient cable slack is confirmed, tighten down the cable ties to secure the DAP
cable to the existing cable drape.
8. Arrange the cable bundle as shown in Figure 4-14, use a cable tie to maintain cable positions.
9. Install the clamp onto the cable bundle. DO NOT TIGHTEN THE CLAMP YET.
J6

Table of Contents

Related product manuals