GE HEALTHCARE
D
IRECTION 5305880-100, REVISION 3 LOGIQ™ 100 PRO SERVICE MANUAL
Page 10-20 Section 10-6 - Electrical Safety Tests
7.) Power ON the LOGIQ™ 100 PRO unit.
8.) Depress the LIFT GROUND rocker switch and record the highest current reading.
9.) Follow the test conditions described in Table 10-18 for every probe.
10.) Keep a record of the results with other hand copies of Planned Maintenance data.
State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.
See the GEHC Myworkshop System to determine the status of this document.
Approved Document - 5305880-100TPH_r3.pdf Page 191 of 197