EasyManua.ls Logo

GE LOGIQ E9 - Page 291

GE LOGIQ E9
808 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
D
IRECTION 5535208-100, REV. 2 LOGIQ E9 SERVICE MANUAL
Chapter 7 Diagnostics/Troubleshooting 7 - 43
7-5-8-1 Digital Receive (cont’d)
Name: Nathan MLA Data Alignment Test
Description: Output TVG of Nathan with system configured for max number of MLAs supported by
system. Each MLA gain is set differently to detect MLA ordering problems. Verifies the alignment (16
identical samples in a row) of IF to GFI.
Run Time: 00:05
If this test failed:
1.) Swap DRX boards to determine if the failure point changes as the boards are moved.
2.) Replace any failed DRX boards.
7-5-8-2 Memory
See: 7-5-3 "Diagnostics Window Overview" on page 7-22 for a description of the looping and list
features.
Symptoms:
Intermittent Problems
Communication Problems
1.) Select the Memory checkbox to run all the tests, or select the individual subtests to run only the
selected tests.
2.) Enter the desired Loop Count (numeric value of 4 digits or less).
3.) Click Execute to run the test(s).

Table of Contents

Other manuals for GE LOGIQ E9

Related product manuals