GE
D
IRECTION 5535208-100, REV. 2 LOGIQ E9 SERVICE MANUAL
Chapter 7 Diagnostics/Troubleshooting 7 - 67
7-5-8-11 Tx Power Supply Test
See: 7-5-3 "Diagnostics Window Overview" on page 7-22 for a description of the looping and list
features.
Symptoms:
• System will not scan
• Interrupted scanning
• Scan unexpectedly stops
1.) Select the Tx Power Supply Test checkbox to run all the subtests, or select the individual subtests
to run only the selected tests.
2.) Enter the desired Loop Count (numeric value of 4 digits or less).
3.) Click Execute to run the test(s).