EasyManua.ls Logo

GE LOGIQ E9 - Page 316

GE LOGIQ E9
808 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
D
IRECTION 5535208-100, REV. 2 LOGIQ E9 SERVICE MANUAL
7 - 68 Section 7-5 - Common Service Desktop
7-5-8-11 Tx Power Supply Test (cont’d)
Name: TxPs Control Test
Description: Transmit Power Supply Control Test (Verifies the voltage points are within specifications)
Run Time: 00:10
If this test failed:
1.) Replace the power supply
Name: TxPs Watchdog Test
Description: Transmit Power Supply GFI Watchdog Test (Tests that the power supply watchdog is
working)
Run Time: 00:07
If this test failed:
1.) Replace the power supply
Name: TxPs Alarm Test
Description: Transmit Power Supply Alarm Test (Tests the fault detection of power supply)
Run Time: 00:04
If this test failed:
1.) Replace the power supply
Name: TxPs Keep Alive Test
Description: Transmit Power Supply Keep Alive Test (Tests the communication between BEP and
power supply and fault detection)
Run Time: 00:07
If this test failed:
1.) Replace the power supply

Table of Contents

Other manuals for GE LOGIQ E9

Related product manuals