GE
D
IRECTION 5535208-100, REV. 2 LOGIQ E9 SERVICE MANUAL
Chapter 7 Diagnostics/Troubleshooting 7 - 69
7-5-8-12 EPS (Extended Power Shutdown) or CB (ChargeBoard used in BEP6) Tests
See: 7-5-3 "Diagnostics Window Overview" on page 7-22 for a description of the looping and list
features.
Symptoms:
• System shuts down immediately after power loss/interruption
1.) Select the Extended Power Shutdown Tests checkbox to run all the tests, or select the individual
subtests to run only the selected tests.
2.) Enter the desired Loop Count (numeric value of 4 digits or less).
3.) Click Execute to run the test(s).