8-6-4-5 Functional Checks
Perform the following functional tests to confirm the LOGIQ E9 is operational before returning the
LOGIQ E9 to the customer.
If all are successful, include the following debrief script: LOGIQ E9 Service Manual, Direction
5535208-100, Rev. 2. Equipment passed all required tests and is ready for use.
Table 8-76 V2 LCD Arm Adapter replacement Functional Checks
See:
Section
Functional Checks Debrief Script
4-2-2 Power ON/Boot Up
LOGIQ E9 Service Manual, Direction
5535208-100, Rev. 2. Leakage Current
measured at (record the value) and meets
allowable limits. Equipment passed all required
checks and is ready for use.
4-2-3 Power shut down
4-2-4 Top Console position adjustment
4-3-5 B-Mode Checks
4-3-7 System CFM and PWD Checks
6-3-4 LCD Adjustment Procedure

Table of Contents

Other manuals for GE LOGIQ E9

Related product manuals