EasyManuals Logo

GE LOGIQ E9 Service Manual

GE LOGIQ E9
808 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #510 background imageLoading...
Page #510 background image
GE
D
IRECTION 5535208-100, REV. 2 LOGIQ E9 SERVICE MANUAL
8 - 164 Section 8-6 - Replacing Top Console Parts
8-6-11-5 Options Holder installation
1.) If this Options Holder will be supporting a Gel Warmer, place the Gel Warmer in the Options Holder
first and then install the Gel Warmer to the Options holder.
NOTE: Be sure the Gel Warmer cable fits in the cable channels and is not pinched.
2.) Position the Options Holder in place.
NOTE: Be sure the Gel Warmer cable fits in the cable channels and is not pinched.
3.) Install the three screws securing the Options Holder.
4.) Install the Storage Tray or Transvaginal Probe Holder to the Options Holder, if applicable.
Figure 8-47 Screw locations

Table of Contents

Other manuals for GE LOGIQ E9

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ E9 and is the answer not in the manual?

GE LOGIQ E9 Specifications

General IconGeneral
TypeUltrasound System
3D/4D ImagingYes
Transducer Ports4 active ports
ConnectivityDICOM, USB, Ethernet
ApplicationsAbdominal, Vascular, Musculoskeletal, Small Parts, Urology, Pediatric, Cardiac, Obstetrics/Gynecology
TransducersLinear, Convex, Phased Array, Volume
Doppler ModesColor Doppler, Power Doppler, Pulsed Wave Doppler, Continuous Wave Doppler
ElastographyYes
Advanced FeaturesB-Flow, Volume Navigation
PortabilityCart-based system
Display19-inch high-resolution LCD monitor

Related product manuals