EasyManua.ls Logo

GE LOGIQ E9

GE LOGIQ E9
808 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
D
IRECTION 5535208-100, REV. 2 LOGIQ E9 SERVICE MANUAL
8 - 248 Section 8-10 - Main Power Supply parts replacement
1.
Reconnect the Mains PS Cable and all
cables -
AC Output to Peripherals, Printer, Power to
BEP and USB on top of the Main PS.
If the Shear Wave option is installed,
reconnect the cable that supplies voltage to
the Capacitor Pack.
(Cherokee/Mitra) PS connectors
(Lambda) PS connectors without Shear Wave option
(R4 and earlier)
(Lambda) PS connectors with Shear Wave option
(R5 and later)
PCIe Cable routed between Card Cage and Targa (right side
view). GFI Configuration only. MRX does not use this cable.
2.
Install the Rear Cover, Top Cover and Side Covers.
3.
Perform Functional Checks. See: 8-10-2-3 - Calibration and adjustments,
8-10-2-4 - Verification and 8-10-2-5 "Functional Checks" on page 8-249.
Table 8-159 Main PS installation
Steps Corresponding Graphic

Table of Contents

Other manuals for GE LOGIQ E9

Related product manuals