GE
D
IRECTION GB091046, REVISION 2 VIVID E9 / VIVID E7 BT’13 SERVICE MANUAL
Index - 8 -
maintenance 10-12
recognition 7-7
probes
connect 3-21
disconnecting 4-41
environmental requirements 2-8
phased and linear probes 5-28
returning/shipping 1-26
product
description 1-5
icons 1-8
manuals 9-77
product locator installation card 3-54
product manuals 5-84
puls pressure transducer
connect 3-20
Pulsed (PW) Doppler 5-14
purchaser responsibilities 2-10
PW Doppler 5-14
PW/CW Doppler mode checks 4-38
Q
quality assurance 10-2
periodic maintenance 10-2
quality test screen 7-4
QWERTY keyboard 5-15
configuration 3-30
difficult to lock/release 7-18
replacement 8-130
R
raise/lower the top console 4-11
rear bumper replacement 8-45
rear cover replacement 8-38
rear filter replacement 8-180
rear handle replacement 8-46
receiver and transmitter
subsystem 5-27
receiver and transmitter signal control 5-29
Receiver Board 5-37
receiver board
replacement 8-217
Receiver Board (GRX) 5-37
receiver signal path 5-28
receiving and unpacking the equipment 3-4
receiving the ultrasound scanner 3-5
recording important settings and parameters 4-19, 8-10
recycling information
packing materials 3-14
regulated medical waste 1-26
relay board 5-34
relay board (RLY)
replacement 8-214
release top console when power is unavailable 7-3
reloading software
from repository 8-12
remote archive’s networkinformation
setup 3-44
renewal parts 9-1
repair parts
returning/shipping 1-26
replace
back end processor 8-229
BEP 8-229
BEP fan
fan
BEP fan replacement 8-257
BEP parts 8-229
center speaker (woofer), replace
subwoofer 8-191
graphics adapter 8-247
trackball 8-114
replace woofer 8-191
replacement procedures 8-1
replacing the
alpha-numeric keyboard 8-130
bulkhead board 8-143
covers and bumpers 8-24
frame w/LCD and touch screen 8-90
gel cup 8-155
LCD arm assembly 8-71
LCD cables 8-75
LCD monitor assembly 8-60
operator panel, lower 8-110
operator panel, upper 8-84
probe holder inserts 8-154
speaker assembly
8-141
XYZ parts 8-160
request for service (RFS) 5-5
required facility needs 2-11
requirements verification 3-17
reset
BEP from a hang 7-2
returning/shipping
probes and repair parts 1-26
returning/shipping probes and repair parts 1-26, 8-4
revision history
for this manual -xv
RFS
request for service 5-5
Right, Left, Front and Back
definition 9-2
RLY
relay board 5-34