3: GSN 200
40
Geodesic Sensor Net Technical Manual
S-MAN-200-GSNR-001 • January 31, 2007
views of the GSN 200. Most of the wire management is done manually, by grouping
wires together with plastic stays.
Figure 3-2. GSN 200 (256-channel model)
Figure 3-3. GSN 200 (128-channel model), without wire management
Hypertronics
connector
Sensor
array
Chin
strap
Sensor lead
bundle
Sliding wire
guide
Nasion
Cord lock for chin strap
Cord lock for eye and
ear electrode bands
Cord lock for eye and
ear electrode bands
Front
Side Back
Cord lock for eye and
ear electrode bands