Glossary of terms used with Geodimeter Systems
F
A file in a Geodimeter memory device that
holds known coordinates (Pno, N, E etc.) or
Roadline data.
Aim/Measure button. Initiates a measurement
and controls search and remote measurements.
Accurate measurement with mean value calc.
These values represents the collimation errors.
When performing D-bar measurements in two
faces these errors are blanked out and do not
affect the accuracy of the measurement (HA,
VA). If the values differs a lot from 0 it is
recommended that you perform a test
measurement (MNU 5), see page 1.2.20.
Also known as Resection. Location of the total
station by measuring distance and/or angles to
2 or up to 10 points.
Fast Standard measurement, with A/M
Instrument height over the point.
A file in a Geodimeter memory device that
holds data collected in the field. This file can
consist of any data.
Entering Job file and memory unit when
designing an U.D.S. with program 40.
Length offset to measured slope distance.
The prism's length offset from the 0-constant.
Reference Object, also back sight.
Area File:
A/M-key:
D:
dH & dV
Free Station:
FSTD:
IH:
Job File:
Logon:
Offset:
Prism const:
Ref. Obj: