EasyManua.ls Logo

Gree GMV-S280W/A-X

Gree GMV-S280W/A-X
391 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GMV5 Home DC Inverter Multi VRF Units
134
5.3.2 Monsoons must be considered during ODU installation
5.3.3 Snow must be considered during ODU installation.
In order to prevent covering the air supply and air return by snow, an air supply protective
cover and air return protective cover and one foundation shall be applied.
5.3.4 Installation space requirement for equipment floor
If the ODU is to be installed in the equipment floor, induced and exhaust air duct must be
connected;
In the equipment floor, the opening rate of shutters must be at least 80%, and the angle
between the shutters and the horizontal plane should be less than 20°.
5.3.4.1 Preparation before installing static pressure ventilating duct
1The ODU is installed properly;
2The steel-plate ventilating duct is designed based on the unit and engineering requirement,
and is installed properly according to the engineering standards;
3Based on the unit dimensions and the size of steel-plate ventilating duct, prepare materials
such as canvas casing, tin foil, steel bar and tapping screw, as well as tools such as
hand-operated electric drill, air screw driver and screwdriver.

Table of Contents

Related product manuals