GMV5 Home DC Inverter Multi VRF Units
206
Make sure the compressor has been preheated for more than 8 hours.
When unit commissioning is started, the system automatically selected an operation mdoe
according to the environment temperature.
a. When outdoor temperature is higher than 20, commissioning should be in cooling mode
and water heating mode.
b. When outdoor temperature is lower than 20, commissioning should be in heating mode
and water heating mode.
Note: If system is not connected with water tank or the water heating function of hydro box is
wrongly set, unit will not run in water heating mode.
⑶、Before starting commissioning, make sure again that stop valves of all basic modules of
the outdoor unit have been completely opened.
⑷、 During commissioning, the front panel of outdoor unit must be completely covered.
Otherwise, commissioning accuracy may be affected (as shown in the following figure).
⑸、 Before commissioning, make sure that additional refrigerant to pipes has been finished
completely or for more than 70%.
⑹、 The following table describes progress display of each phase during commissioning:
Progress Description for Commissioning Phases
——
Commissioning
code
Progress code
Status code
Meaning
Progress
LED1
LED2
LED3
Code
Display
status
Code
Display
status
Code
Display
status
01_Master unit
setting
db
ON
01
ON
A0
ON
System is in non-commissioning