GMV5 Home DC Inverter Multi VRF Units
322
4. Remove the gas
liquid separator.
●Unscrew and remove the gas
liquid separator.
5. Install a new gas
liquid separator
●Put the gas liquid separator
according to the position of the
suction and discharge pipes and
weld the pipes of gas liquid
separator.
During welding, charge nitrogen
into the pipes. The pressure
should be controlled within 0.5±0.1
kgf/cm2 (relative pressure).
Note: Prevent nearby parts from
being burnt during welding.
●Screw the gas liquid separator
6. Fix and wire the
electric box.
Put the electric box back to
original position and screw it up.
●Connect all wires.
7. Check and install
the front panels.
Check various parts and
connecting lines.
If no problem is found, hook the
front panels and tighten the
screws.