EasyManuals Logo

Hach BioTector B7000 User Manual

Hach BioTector B7000
175 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #108 background imageLoading...
Page #108 background image
Page 108
ACID VOLUME 25.0l ~ 35DAYS
ACID VOLUME allows the user to enter the volume of the acid
reagent. When the volume is programmed, system automatically
calculates the number of days acid reagent will last.
It is strongly recommended that each time acid and base
reagents are replaced or topped up, a Zero Calibration cycle is
activated using the Start New Reagent Cycle function in Install
New Reagents menu or alternatively using the Run Zero
Calibration function in Zero Calibration menu.
BASE VOLUME 25.0l ~ 35DAYS
BASE VOLUME allows the user to enter the volume of the base
reagent. When the volume is programmed, system automatically
calculates the number of days base reagent will last.
HCl WATER VOLUME 10.0l ~ 38DAYS
HCl WATER VOLUME allows the user to enter the volume of the
HCl water solution if programmed in systems built with FMI
heavy duty Circulation Pump. When the volume is programmed,
system automatically calculates the number of days HCl water
solution will last.
TN CLEANING VOLUME 25.0l ~150DAYS
TN CLEANING VOLUME allows the user to enter the volume of
the TN cleaning solution. When the volume is programmed,
system automatically calculates the number of days TN cleaning
solution will last.
DI WATER VOLUME 25.0l ~ 60DAYS
DI WATER VOLUME allows the user to enter the volume of the
DI water. When the volume is programmed, system
automatically calculates the number of days DI water will last.
Autocal Program
TIME 00:00
TIME (00:00 by default) schedules the Zero & Span Calibration
or Check reactions time (in HR:MIN) for the weekdays if any is
programmed below.
MONDAY S CHECK
TUESDAY Z CAL
WEDNESDAY ZS CAL
THURSDAY -- --
FRIDAY -- --
SATURDAY -- --
SUNDAY -- --
In this menu, Zero and/or Span Calibration reactions and/or
Check reactions are scheduled if programmed on a particular
day of the week. Note that by default, there will be no scheduled
zero and span cycles in the system.
If CAL (CALIBRATION) is programmed, system generates the
zero and span adjust figures which are applied to the reaction
results. If CHECK is programmed, system does not generate
any zero or span adjust figures.
The meaning of the abbreviations used in this menu are as
follows:
- - No function is programmed.
S Span reactions only.
Z Zero reactions only.
ZS Zero reactions followed by Span reactions.
CAL Calibration reactions
CHECK Check reactions.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hach BioTector B7000 and is the answer not in the manual?

Hach BioTector B7000 Specifications

General IconGeneral
BrandHach
ModelBioTector B7000
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals