EasyManuals Logo

Hach BioTector B7000 User Manual

Hach BioTector B7000
175 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #72 background imageLoading...
Page #72 background image
Page 72
Confirm the HCl Water Pump (if fitted for FMI Circulation Pump) is pumping correctly. The
pump rate should be between 8.5ml and 11.5ml in ~18 seconds.
_____
Confirm the WMM60 Sample Pump is pumping correctly. The pump rate at 16 pulses should
be between 5.5ml and 7.5ml in ~8 seconds.
_____
Confirm that the Exhaust, Sample Out, TOC Acid and Base Valves are working. Note that the
Base Valve is optional.
_____
Confirm that the Sample (ARS) Valve is working.
_____
Confirm the MFC is working and pressure on the BioTector oxygen regulator is 350 mbar at
20 l/hr.
_____
Additional requirements for the TN system (next 2 items):
Using the Simulate, Liquid Phase Simulate menu, check the following:
Confirm the WMM60 Nitrogen Pump (N Pump) is pumping correctly. The pump rate at 16
pulses should be between 6.5ml and 7.5ml in ~8 seconds. The pump rate can be measured
by supplying DI Water or tap water to the pump at the inlet port using a small container.
_____
Confirm that all installed valves in the TN system are operating correctly, using the Liquid
Phase Simulate menu.
_____
Go to Operation, Reagents Setup, Install New Reagents menu, confirm the menu items and
select the “START NEW REAGENT CYCLE” function for the system to prime the reagents
and set the Zero Adjust (zero offset) values automatically.
_____
Confirm that the automatic pressure/flow test is passed when analyzer is started up.
_____
When the Zero Calibration cycle is completed, go to Operation, Start Stop menu and stop the
analyzer. Run 5 reactions on DI Water using the manual sample port. If manual port is not
available, use the input point for stream 1, but first set the Sample Pump REVERSE time to 0
seconds in Sample Pump menu. Confirm that the zero response is correct. If the BioTector
has been in storage for a long period, a second “Install New Reagents” cycle may be
required.
_____
If the zero readings and CO
2
peaks are correct, items from 1 to 6 below can be skipped.
_____
1
Confirm that the pH in the reactor is correct, using the test sequence in the pH Test
menu. See pH Test section in BioTector user manual for details.
_____
2
Check for a pH of 0 during the TIC phase.
_____
3
Check for a pH of 14 during the Base Oxidation phase.
_____
4
Check for a pH of 0 during the TOC phase.
_____
5
Run a further 2 reactions on DI Water.
_____
6
Run an “Install New Reagents” cycle on the system to adjust the zero offset.
_____

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hach BioTector B7000 and is the answer not in the manual?

Hach BioTector B7000 Specifications

General IconGeneral
BrandHach
ModelBioTector B7000
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals