Figure 5 Installation kit
1 Grab sample assembly 4 Beaker, plastic, 100 mL
10
2 Sample inlet tubing, black, ¼-in. OD, 15 m (50 ft) 5 DVD with installation overview video
3 Drain tubing, clear, ½-in. ID, 3 m (10 ft)
Figure 6 Monthly maintenance kit (not included)
1 Indicator bottle
11
4 Zero standard water
2 Buffer bottle
11
5 Funnel
3 DPD bottle
11
Figure 7 Performance check kit
1 Ampule breaker 3 Dilution water
2 Chlorine standard ampule, 20 mL
11
10
The beaker is not used for installation. Use the beaker for monthly maintenance.
11
Keep the reagent bottles and the ampule in a vertical position. Refer to the labels and IFU on the
components for the storage requirements.
English 13