EasyManuals Logo

Hach CM130 User Manual

Hach CM130
112 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #29 background imageLoading...
Page #29 background image
Remote indicator mounting
N O T I C E
In accordance with UL 61010-1, the remote indicator must be installed 1.5 m (4.9 ft) or more from patients in the
hemodialysis treatment room.
Attach the remote indicator to a wall or ceiling in the treatment room. The fasteners are supplied by
the user.
Note: An illustration is supplied for each step number starting at step 3.
1. Identify the installation location for the remote indicator.
2. Put the cable for the remote indicator through the wall or ceiling from the analyzer to the
installation location of the remote indicator.
The cable is supplied by the user. Refer to Specifications on page 3 for the cable specifications.
English
27

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hach CM130 and is the answer not in the manual?

Hach CM130 Specifications

General IconGeneral
DisplayLCD
Parameter MeasuredConductivity
Resolution0.1 µS/cm (conductivity), 0.1 mg/L (TDS), 0.1 ppt (salinity)
Accuracy±1% of reading
Operating Temperature0 to 50 °C
Cell ConstantK = 1.0
Operating Conditions0 to 50°C (32 to 122°F), 0 to 95% relative humidity (non-condensing)

Related product manuals