Lift the front panel
Cable installation is complete. Lift the front panel. Tighten the two screws on the front panel to keep
the front panel up.
Connect the power cord
D A N G E R
Electrocution hazard. In potentially wet locations, a Ground Fault Circuit Interrupt (GFCI/GFI) device
must be used for connecting the equipment to its main power source.
D A N G E R
Electrocution hazard. Do not use conduit to supply power. The enclosure does not have a protective
Earth Ground (PE) connection.
Connect the power cord to an electrical outlet with protective earth ground. The analyzer starts.
Configuration
Set the time zone
Enter the time zone of the analyzer location.
1. Push menu.
2. Select Settings.
3. Select Time zone. Refer to Figure 16.
4. Select the time zone of the analyzer location. Options: New York, Chicago, Denver, Phoenix, Los
Angeles, Anchorage or Honolulu.
5. Push back to save the changes.
Figure 16 Settings Screen—Time Zone
Set the date and time
Enter the current date and time.
1. Push menu.
2. Select Settings.
English