EasyManua.ls Logo

Hach CM130 - Page 25

Hach CM130
112 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. Install a sample filter (Y-strainer) and a shut-off valve as follows:
a. Plumb a sample filter in the black tubing between the check valve and the sample source.
b. (Optional) If the analyzer is not near the sample source, install a shut-off valve near the
analyzer. Plumb the shut-off valve in the black tubing between the sample filter and the
sample source.
6. Gently pull on the tubing at each tubing connection to make sure that the tubing is held securely.
English 23

Table of Contents

Related product manuals