7. Connect the colorimeter cable as follows:
a. Align and push the colorimeter connector on the mating connector.
b. Lift the cable clamp.
c. Push the connector into the cable clamp.
8. Put the reagent delivery connector into the reagent delivery board. Refer to the next figure for the
location of the reagent delivery connector.
9. Connect the power cord to the electrical outlet. Wait for the analyzer to start up (approximately
2 minutes).
10. Complete the steps that show on the display to complete periodic maintenance. The display
screens are shown for reference in Appendix B.
English 51