339
Medium ESP Duct Type
Indoor Unit (AD*MNERA)
14.3 Dimension
203
140
264
264
264
1015
1135
*437(Gap between suspending rod)
Ø200
1015
240
170
240
285
32
Instal when air returns from
back side
R11
52
137
Above 300mm
Above 150mm
0-5mm
�205
Fresh air inlet
1179 (Gap between suspending bolt)
Drainage
hose
Above 20mm
270
742
Suspending
bolt4-M10
4-Φ 3.2 flanging holes
spreads are distributed
on a circle
Air outlet4-Φ205
①
②
③
④
⑤
240
1015
Gnsal when air
returns from
bottom
The installation distance marked with * can
be adjusted according to installation
space(largest:510mm,smallest:370mm)
Part name
Maintenance board
Gas pipe connection port
Drainage pipe connection port
SN
1
2
3
4
5
Electric box
Liquid pipe connection port