Setup and installation
1. Transport the machine to the installation site as in-
structed in the „Transport“ chapter and the enclosed
transport or installation instructions.
2. Position the machine with the aid of a spirit level to
ensure that the machine functions precisely and oper-
ates smoothly.
Compensate for uneven floors with the „adjusting
screws“.
! Spirit level
" Adjusting screws
Fig. 29: Positioning the machine
Fig. 30: Floor mounting
3. If necessary, the machine can be bolted down to the
floor with the transport brackets.
! Transport brackets
Fig. 31: Transport locking device Sliding table
4. Before the machine operates for the first time, re-
move, from both sides, the wedges between the base
and sliding table.
5. Remove the oxidation protective layer from all blank
machine parts.