MODBUS-GW Installation and Operation Manual — P/N LS10015-000NF-E:C2 4/30/2019 21
System Power Installation
2.4 System Power
2.5 Testing and Maintenance
Testing and maintenance should be performed according to the Testing and Maintenance section of NFPA-72 and CAN/ULC S536.
Table 2.5 Power Requirements
Power Requirement
Input Voltage (Nominal) 24 VDC
Input Current @ 24 VDC 125 mA