Process Insertion
Pressure models
Revision 12 OneWireless XYR 6000 Transmitters Quick Start Guide 27
February 2013
Temperature and Discrete Input models
Insert probe into process
ATTENTION
It is your responsibility to supply a suitable sealing method or gasket and mounting hardware
for the probe’s service conditions.
Integral
Rig id
Integral
Sp rin g
loaded
Re m o t e
Rig id
Re m o t e
Sp ri n g
loaded
Figure 3-4 Temperature probes
Integral probe wiring
The integral probe is pre-wired to the transmitter at the factory.
Remote probe wiring
Step Action
1
See Figure 3-4. Open the transmitter’s rear end cap (opposite end from display) by loosening
the M3 locking screw and unscrewing the end cap.
2
Open the cable gland (on right side below antenna). (Cable gland must be ordered as an
option.)
3
Feed wiring (6 to 8 mm allowed diameter) through the cable gland and connect to terminal
block. For terminal connections see info starting on page 55.
4
Plug battery connector into batteries. See page 47.
5
Close rear end cap and cable gland.
6
Tighten M3 locking screw on the rear end cap.