5-6. EQUIPMENT REQUIRED
5-7.
Table 1-5,
of the Operating and Programming Manual, lists the equipment required for the adjustment pro-
cedures. If the test equipment recommended is not available, other equipment may be used if its performance
meets the critical specifications listed in
Table 1-5.
The specified equipment required for each adjustment is
referenced in each procedure.
5-8.
FACTORY-SELECTED COMPONENTS
5-9. Factory-selected components are identified on the schematics and parts lists by an asterisk
(*)
which fol-
lows the reference designator. The nominal value or range of the component is shown. Manual change sheets
will provide updated information pertaining to selected components.
5-10. RELATED ADJUSTMENTS
5-11. Adjustments that interact are noted
in
the adjustment procedures.
Table 5-1 lists the adjustmerrt proce-
dures and the recommended order of performance.
Table
5-2,
Post-Repair Adjustments, lists the recommended
adjustments to perform following a repair to different sections of the Counter.
Table 5-2. Post-Repair Adjustments
Input Amplifier
DAC
Measurement
Executive
HP-IB
Time Base
Power Supply
Front Panel
MATE (Option
700)
Channel C (Option
030)
ADJUSTMENTS
(paragraph)
FUNCTIONAL BLOCK REPAIRED
Figure
8-20
Figure
8-21
Figure
8-22
Figure
8-22
Figure
8-23
Figure
8-24
(standard oscillator)
Figures
8-24
and
8-27
(Option
010)
Figure
8-24
Figure
8-28
Figure
8-25
Figure
8-26
SCHEMATIC SHEET
5-16
through
5-20
5-1
3,
5-1 4
None
None
None
5-15
through
5-20
5-15
through
5-20
5-1 2
through
5-20
None
None
5-2 1
5-12. POWER SUPPLY VOLTAGE ADJUSTMENT
Reference:
Figure
8-24
Description: The
+3V
dc power supply is adjusted for
+3.00V
dc
?
.02V
dc at Test Point
"
+3"
using a digital
multimeter.
HP
5334B
-
Service Manual
5-3