7
Installing the switch in a 19-inch rack
Installation accessories
Table 5 Installation accessories for the HPE 5510 HI switches
Installation requirements
HPE 5510 24G 4SFP+ HI
HPE 5510 48G 4SFP+ HI
HPE 5510 24G SFP
4SFP+ HI
Front
mounting
bracket
kit
The mounting bracket kit can be
installed on the port side, power
supply side, or the mid-mounting
position.
See "Rack-mounting by
using front mounting
brackets."
HPE 5510 24G PoE+
4SFP+ HI
HPE 5510 48G PoE+
4SFP+ HI
Front
mounting
bracket
kit
The front mounting bracket kit must be
installed on the mid-mounting
position.
See "Rack-mounting by
using front mounting
brackets."
Front and
rear
mounting
bracket
kits
The mounting bracket kit can be
installed on the port side or power
supply side.
The distance between the front
rack post and the rear rack post
must be in the range of 429 to 595
mm (16.89 to 23.42 in).
See "Rack-mounting by
using front and rear
mounting brackets (HPE
5510 24G PoE+ 4SFP+
HI and HPE 5510 48G
PoE+ 4SFP+ HI)."
Figure 2 Rack-mounting procedure (1)
Figure 3 Rack-mounting procedure (2)
If a rack shelf is available, you can put the switch on the rack shelf, slide the switch to an appropriate
location, and attach the switch to the rack by using the mounting brackets.
Attach the front
mounting brackets to the
two sides of the switch
Identify the mounting position (port
side, power side, or middle
position) for the mounting brackets
Mount the switch in the rack
Attach the front
mounting
brackets to the
two sides of the
switch
Attach the load
bearing screws to
the switch
Attach the
rear
mounting
brackets to
rack posts
Identify the mounting
position (port side or
power side) for the
mounting brackets
Mount the switch in
the rack