55
configuring stack basic settings, 28
stack, 24
member
config
uring stack member switch basic
settings, 28
con
necting stack physical interfaces, 28
identifying sta
ck member switch physical
interfaces, 26
s
tack member ID, 24
mounting
workbench mounting switch, 9
N
netwo
rk management
maintaining the switch, 29
set
ting up stack, 23
trouble
shooting configuration terminal
problems, 31
trouble
shooting the switch, 29
netwo
rking
planning stack cabling scheme, 26
no termin
al display (troubleshooting), 31
P
parity (pa
rameter), 21
physi
cal port
connecting, 28
identifying sta
ck member switch physical
interfaces, 26
planni
ng
stack cabling scheme, 26, 26
stack conn
ections, 25
st
ack member IDs, 24
stack topol
ogy, 25
port
connecting stack physical interfaces, 28
identifying sta
ck member switch physical
interfaces, 26
LED (SFP
+), 46
set
ting up stack, 23
SFP+
, 39
techni
cal specifications, 38
port mod
e
LED, 42
power supply
cable, 12
c
onnecting AC power source, 12
con
necting A-RPS1600, 13
con
necting A-RPS800, 14
failure (troubl
eshooting), 29
powerin
g on switch, 22
prep
aring for installation, 1
preventin
g
EMI prevention, 2
pro
cedure
configuring stack basic settings, 28
c
onnecting AC power source, 12
con
necting A-RPS1600, 13
con
necting A-RPS800, 14
c
onnecting power cord, 12
con
necting stack physical interfaces, 28
grou
nding switch with grounding conductor buried
in the earth ground, 11
grou
nding switch with grounding strip, 10
grou
nding the switch, 10
identifying sta
ck master switch, 24
identifying sta
ck member switch physical
interfaces, 26
installing switch, 5
installing switch on 19-inch rack, 6
maintaining the switch, 29
mounting swit
ch on workbench, 9
planni
ng stack connections, 25
planni
ng stack installation site, 24
planni
ng stack member IDs, 24
planni
ng stack topology, 25
set
ting up stack, 23
trouble
shooting AC input failure, 29
trouble
shooting Concurrent RPS and AC input
failure, 30
trouble
shooting garbled terminal display, 31
trouble
shooting no terminal display, 31
trouble
shooting power supply failure, 29
trouble
shooting RPS DC input failure, 29
trouble
shooting the switch, 29
Q
quick set-up
CLI login
requirements, 18
R
r
ack
attaching mounting bracket to switch chassis, 6
mounting
switch to workbench, 9
mounting the
switch, 8
swit
ch installation on 19-inch rack, 6
verifying swit
ch installation (19-inch rack), 15
RPS
LED, 42
RPS DC in
put
failure (troubleshooting), 29
S
s
afety