3. Do one of the following:
• Extend the server from the rack.
•
Remove the server from the rack.
4.
Remove the access panel.
5. Remove the air bale.
Release the full-length expansion board retainer
Procedure
1.
Power down the server.
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
•
Extend the server from the rack.
• Remove the server from the rack.
4.
Remove the access panel.
5. Removing the air bale.
6. Remove the air 
bale diverters.
Removal and replacement procedures
39