7. Install the GPU card into the riser.
8. Install the riser cage.
9. Install the access panel (Installing the access panel on page 56).
10. Install the server into the rack (Installing the server into the rack on page 48).
11. Connect each power cord to the server.
12. Connect each power cord to the power source.
13. Power up the server on page 53.
Controller options
The server supports the following storage controllers:
• Embedded controllers
Enabled through System Utilities and configured through HPE Smart Storage Administrator (Intelligent
Provisioning)
• Type-a controllers
114 Installing hardware options