EasyManua.ls Logo

HPE ProLiant e910

HPE ProLiant e910
182 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
To replace the component, reverse the removal procedure.
Removing and replacing the NVMe M.2 enablement board
Procedure
1.
Power down the server blade.
2.
Remove the server blade from the chassis.
3.
For 2U server blade, do the following:
a.
Remove the top cover.
b.
Remove the air bale.
4.
Remove the NVMe M.2 SSD module.
5. Remove the M.2 enablement board.
Removal and replacement procedures 155

Table of Contents

Related product manuals