11. Install the air bale.
1U server blade air bale
2U server blade air bale
12.
For 2U server blade, install the top cover.
13.
Install the server blade in the chassis.
14.
Power up the server blade.
Removing and replacing the system board
Removing the system board
Prerequisites
Before you perform this procedure, make sure that you have a T-15 Torx screwdriver available.
Procedure
1.
Power down the server blade.
2. Remove the server blade from the chassis.
3. For 2U server blade,
remove the top cover.
4. Remove the air bale:
1U server blade air bale
2U server blade air bale
5. Remove all DIMMs.
6. If installed, remove these options from the system board.
Removal and replacement procedures 167