EasyManua.ls Logo

HPE ProLiant e910

HPE ProLiant e910
182 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Procedure
1. Power down the server blade.
2. Remove the server blade from the chassis.
3. For 2U server blade, do the following:
a.
Remove the top cover.
b. Remove the air bale.
4. If installed, remove the metal plate from the front of the server blade.
5.
If installed, remove the NVMe M.2 enablement board.
6.
Install the network riser.
1U server blade
Hardware options installation 35

Table of Contents

Related product manuals