EasyManua.ls Logo

HPE ProLiant e910

HPE ProLiant e910
182 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. For 2U server blade, remove the top cover.
5. Open the DIMM slot latches.
6. Install the DIMM .
7.
Install the air bale:
1U server blade air bale
2U server blade air bale
8.
For 2U server blade, install the top cover.
9.
Install the server blade in the chassis.
10.
Power up the server blade.
Use the BIOS/Platform Configuration (RBSU) in the UEFI System Utilities to configure the memory mode.
40 Hardware options installation

Table of Contents

Related product manuals