EasyManua.ls Logo

HPE ProLiant ML30 Gen10

HPE ProLiant ML30 Gen10
142 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. Do one of the following:
If the server is in tower mode:
Position the tower server for hardware configuration.
If the server is in rack mode: Remove the server from the rack.
5.
Remove the front bezel.
6. Remove the access panel.
7. If installed,
remove the air bale.
8.
Disconnect all power supply cables from the system board, drive cages, and devices.
9.
Remove the standard power supply.
10. Install the RPS cage.
56
Hardware options installation

Table of Contents

Other manuals for HPE ProLiant ML30 Gen10

Related product manuals