EasyManua.ls Logo

HPE XP7 - Page 53

HPE XP7
362 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1. An XP7 disk array has a physical usable capacity of 50TB.
2. A Permanent license is installed on 11/20/2010 to monitor the 50TB physical usable capacity.
3. Another 100TB physical usable capacity is added on 11/30/2010 and must be monitored for 10 days.
4. As the physical usable capacity is beyond the Permanent licensed capacity, PA enters 60 days grace
period on 11/30/2010.
5. 1000TB-Days Meter based Term license are installed on 12/02/2010. The following fields in the
License screen – License Status section display:
License Capacity: 50TB, +1000TB-Days
License Status: Installed
Term (Days): N/A
End Date: Never
After 1:00 PM, the above fields are updated to display:
License Capacity: 50TB, +1000TB-Days
License Status: Installed
Term (Days): 10
End Date: 12/11/2010
6. If 90.5TB is monitored on the same day, PA considers 91TB-Days and again updates the following
fields to reflect the latest data, which is as follows:
License Capacity: 50TB, +909TB-Days
License Status: Installed
Term (Days): 9
End Date: 12/10/2010
Nine days count from 12/02/2010
If 85.5TB is used during the first half of 12/03/2010 and no additional TB-Days are used for the rest of
the day, PA uses 86TB-Days and considers the 0.5 days as one day. In addition, the following fields
are updated after 1:00 PM to reflect the latest data, which is as follows:
License Capacity: 50TB, +823TB-Days
License Status: Installed
Term (Days): 8
End Date: 12/09/2010
Eight days count from 12/02/2010
If 100.5TB is used during the second half of 12/04/2010, PA uses 101TB-Days and considers the 0.5
days as one day. In addition, the following fields are updated after 1:00 PM on 12/05/2010 to reflect
the latest data, which is as follows:
PA Licenses 53

Table of Contents

Related product manuals