Step 4 Remove the cover. For details, see Removing the Cover of a G560.
Step 5 Determine the location for installing the TPM. See Figure 6-14.
Figure 6-14 Location of the TPM
Step 6 Take a spare TPM out of its ESD bag.
Step 7 Insert the TPM vertically downwards into the connector on the mainboard. See (1) in Figure
6-15.
Figure 6-15 Installing the TPM
Step 8 Tighten the screw of the TPM using a Phillips screwdriver. See (2) in Figure 6-15.
----End
FusionServer G5500 Server
User Guide
6 Optional Part Installation
Issue 02 (2017-12-15) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
136